Stern rube repair

The shaft tube was replaced by removing the existing stern tube without opening the hull.A new stern tube with enhanced mechanical characteristics was supplied and installed. Special procedures were used to minimise deformation and maintain alignment and were finalised through line boring and the installation of aligned bushings using specialised resins.
New mast construction

As part of a major refit project, the client commissioned the removal of the existing mast and replacement with a newly fabricated 8-metre structure produced in our workshop. Installation required modification and reinforcement of the deck’s structural beams before final positioning onboard.
A new cover for the Yacht

Aluminium Cover with Gull-Wing Doors The client requested a new aluminium cover with side-opening gull-wing doors in the manoeuvring area to protect jet skis and equipment from weather conditions. A new aluminum cover measuring 20 m x 10 m was built, featuring “gull-wing” opening hatches, positioned in the bow tender bay area, in order to […]
The yacht gets a makeover (inside and out)

Replacement of Stabiliser Fins, Elevator Installation & New Outdoor Pool The client requested the replacement of the stabiliser fins, installation of a new elevator, and construction of a new outdoor swimming pool. Rather than replacing only the fins, we opted to build an entirely new block, including shell plating and the associated hydraulic system. This […]